ADS SPACE HERE

KODE PPC ANDA

Denison Mines Corp. ("Denison") and JNR Resources Inc. ("JNR"), jointly the "Companies", are pleased to announce the results from the 2006 summer/fall diamond drilling program on the Moore Lake uranium project located in the Athabasca Basin of northern Saskatchewan. The program consisted of 38 holes totalling 14,317 metres. The Moore Lake project is a joint venture between the two companies, with participating interests of 25% (JNR) and 75% (Denison).

Summary of Results

The Companies are pleased with the results, which continue to outline uranium mineralization in the Maverick Main zone and demonstrate the highly prospective nature of the 6.5-kilometre long Maverick structural corridor, over 50% of which has yet to be drill tested, and the Avalon conductive zone. Significant results are presented in the table below.

Infill drilling on the Maverick Main zone intersected uranium mineralization in all six holes, with high-grade intersections in three of them. ML-140 returned 3.20% U3O8 over 6.5 metres including a 3.5-metre intercept of 5.25% U3O8, 2.1% nickel and 0.65% cobalt. ML-139 returned 1.23% U3O8 over 8.5 metres, including a 1.5-metre intercept of 4.20% U3O8. The mineralization in both of these holes occurs at the unconformity and in the basal sandstone. Also at the Maverick Main zone, ML-133 intersected two zones of mineralization. A high-grade zone at the unconformity returned 2.72% U3O8, 2.30% nickel and 0.905% cobalt over 5.0 metres, including a 2.0-metre intercept of 4.25% U3O8. ML-133 also intersected mineralization in the basement associated with clay-altered graphitic pelites, returning 0.611% U3O8 over 3.5 metres.

complete this report clic here

KODE PPC ANDA

Related Posts by Categories



Widget by Hoctro | Jack Book

0 comments